PUBLIC BUILDINGS

Public buildings place special demands on functionality, safety, and sustainability. From educational institutions and administrative buildings to community facilities, we develop technical concepts that combine operational reliability, energy efficiency, and long-term usability. The result: buildings that not only fulfill their purpose but also provide real added value to the community.

Bild11.jpg

1210 VIENNA

EDUCATIONAL
FACILITY
HINAYSGASSE 1

Client:

WIP Wiener Infrastruktur Projekt GmbH

 

Project Owner:

Stadt Wien - MA56

General Planner / Architect:

Kronaus Mitterer Architekten ZT GmbH

Project Type:

Educational Facility

Project Description:

Planning services for electrical systems

 

Execution Period:

2022-2025

© Image:  Kronaus Mitterer Architekten / expressiv.at

_leer.png

At the former site of Floridsdorf Hospital at Hinaysgasse 1 in Vienna’s 21st district, a new educational facility was constructed. The project combines a full-day middle school, a full-day primary school, a kindergarten, a music school, and a youth center. Some areas overlap in use, while the gymnasiums and hard-surface sports courts are also available for multipurpose use by external groups.

 

The infrastructure for electricity, data and telephone networks, as well as potable water and wastewater, was completely newly installed. Electrical supply is provided via a dedicated transformer station, with the central low-voltage main distribution serving the entire site. A photovoltaic (PV) system is being installed on the building’s roof in cooperation with WienEnergie, covering on-site electricity demand and feeding surplus energy into the grid. The main building and all auxiliary buildings in the courtyard are protected against overvoltage by grounding and lightning protection systems.

Our electrical services scope included, among others:

  • Installation of an elevator in each stairwell

  • Connection to utility supply and disposal networks

  • Installation of a transformer station for electrical supply

  • Installation of grounding and lightning protection systems

  • Installation of a photovoltaic system

 

The result: the new educational facility provides modern, flexible learning and recreational spaces that meet the diverse requirements of the schools, kindergarten, music school, and youth center. Comprehensive technical infrastructure, including energy supply, elevators, and a PV system, ensures an efficient and sustainable building for children, youth, and the wider community.

rendering_Zwentendorf.jpg

RATHAUSPLATZ 4,
3435 ZWENTENDORF
AN DER DONAU

COMMUNITY
CENTER
ZWENTENDORF

Client:
Marktgemeinde Zwentendorf an der Donau

 

Project Owner & General Planner / Architect:

maul-architekten zt gmbh

Project Type:

  • Renovation and extension of the town hall

  • New construction of a music hall and local history museum

  • Extension of the middle school

 

Project Description:

  • Planning services for HVAC, building automation (MSR), and electrical systems

  • Technical supervision of HVAC, MSR, and electrical systems
     

Execution Period:

2020-2021

_leer.png

The existing town hall building was renovated and expanded with an extension. Facilities previously housed in the old building, such as the local history museum and music association, were relocated to a new building section adjacent to the new middle school (NMS) and the town hall. The NMS received an additional storey above the existing gymnasium, providing new classrooms and spaces for after-school care. In addition, existing rooms in the old building were modernized to meet current school requirements.

Our building services (MEP) scope included, among others:

  • Adaptation and expansion of the existing heating systems in the town hall and NMS

  • Installation of central ventilation systems for the town hall, museum, music association, and NMS

  • Installation of a central cooling system for the town hall, museum, and music association using groundwater

  • Air-conditioning of new areas in the NMS

  • Air-conditioning of the existing NMS building

  • Renewal of electrical installations and energy distribution boards

  • Renewal of the low-voltage main distribution for emergency power

  • Expansion of existing emergency and safety lighting in the NMS

  • Expansion of the existing fire alarm system in the NMS

  • Adaptation and partial renewal of the IT infrastructure across all building sections

  • Installation of lightning protection systems

  • Installation of a photovoltaic system on the town hall extension

 

The result: the renovation and expansion created modern, functional administrative and educational facilities that meet the needs of the town hall, school, and community organizations. Efficient technical systems, ventilation, air-conditioning, and energy supply provide a safe and comfortable environment for administration, students, and the public.

techcon-logo-2-zeilig.png

TECH.CON GmbH

Grazer Straße 3

7423 Pinkafeld

T +43 3357 21 300

office@techcon.at

www.techcon.at

Fields of Expertise
Heating engineering | Cooling engineering

Sanitary engineering | Air conditioning and ventilation engineering | Fire protection engineering
Electrical engineering | Power engineering
Safety engineering | Special facilities
Building automation engineering | Conveyor systems

© by TECH.CON GmbH - Legal NoticePrivacy Policy

Website optimized for Google Chrome and Safari.

ANKOe_RZ_RGB_pos1.jpg
ingbuero-mindestgroesse-25mm1.jpg
Bild4.png
Linkedin.png
Facebook.png
Instagram.png
bottom of page